Thursday, November 3, 2016

Silver Spring construction update: Central (Photos)

Central has already topped-out at 8455 Fenton Street in downtown Silver Spring. The Grosvenor Americas mixed-use project is scheduled for delivery in Summer 2017. A total of 243 residential units, and 17,000 SF of retail/restaurant space, will be located steps away from the world-class Silver Spring Library and future Purple Line station.










2 comments:

  1. It would be nice to get our sidewalk back, and they have really trashed the road around it. I hope its repaired after they finish

    ReplyDelete
  2. Hopefully all that retail gets absorbed pretty quickly. Between these 6-7 storefronts+the 3 new storefronts across the street at the senior apt building, that's a ton to get filled up.

    ReplyDelete